Page images
PDF
EPUB

(2) presentation by the vehicle owner of proof of vehicle registration within the geographic area covered by the vehicle inspection and maintenance program (except for any program whose enforcement mechanism is not through the denial of vehicle registration);

(3) another method approved by the vehicle inspection and maintenance program adminis

trator.

(July 14, 1955, ch. 360, title I, Sec. 118, formerly, Sec. 7, as added Pub. L. 88-206, Sec. 1, Dec. 17, 1963, 77 Stat. 399; renumbered Sec. 107, Pub. L. 89-272, title I, Sec. 101(3), Oct. 20, 1965, 79 Stat. 992; renumbered Sec. 111 and amended Pub. L. 90-148, Sec. 2, Nov. 21, 1967, 81 Stat. 499; renumbered Sec. 118 and amended Pub. L. 91-604, Secs. 4(a), 5, Dec. 31, 1970, 84 Stat. 1678, 1689; Pub. L. 95-95, title I, Sec. 116, Aug. 7, 1977, 91 Stat. 711; Pub. L. 101-549, title I, Sec. 101(e), title II, Sec. 235, title III, Sec. 302(d), Nov. 15, 1990, 104 Stat. 2409, 2530, 2574.)

Codification

Section was formerly classified to section 1857f of this title.

Amendments

1990-Subsec. (a). Pub. L. 101-549, Sec. 235, inserted heading.

Pub. L. 101-549, Sec. 101(e), amended second sentence generally. Prior to amendment, second sentence read as follows: "The preceding sentence shall apply (A) to any requirement whether substantive or procedural (including any recordkeeping or reporting requirement, any requirement respecting permits and any other requirement whatsoever), (B) to the exercise of any Federal, State, or local administrative authority, and (C) to any process and sanction, whether enforced in Federal, State, or local courts or in any other manner."

Subsec. (b). Pub. L. 101-549, Sec. 302(d), substituted "section 7412(i)(4) of this title” for “section 7412(c) of this title".

Subsecs. (c), (d). Pub. L. 101-549, Sec. 235, added subsecs. (c) and (d). 1977–Subsec. (a). Pub. L. 95-95, Sec. 116(a), designated existing first sentence as subsec. (a) and inserted provisions enumerating the legal and administrative areas to which the compliance requirements apply and directing that agencies, officers, agents, and employees not be immune and that officers, agents, or employees of the United States not be personally liable for civil penalties for which they are not otherwise liable.

Subsec. (b). Pub. L. 95-95, Sec. 116(b), designated second and following existing sentences as subsec. (b) and inserted provisions authorizing the President to exempt weaponry, equipment, aircraft, vehicles, and other classes and categories of property of the Armed Forces and the National Guard from compliance but to reconsider the need for such an exemption at threeyear intervals.

1970-Pub. L. 91-604, Sec. 5, struck out lettered designations (a) and (b), and, as so redesignated, substituted provisions requiring Federal facilities to comply with Federal, State, local, and interstate air pollution control and abatement requirements and provisions authorizing the President to exempt, under the specified terms and conditions, any emission source of any department, etc., in the executive branch from compliance with control and abatement requirements, for provisions requiring, to the extent practicable and consistent with the interests of the United States and within any available appropriations, Federal facilities to cooperate with the Department of Health, Education, and Welfare and with any air pollution control agency to prevent and control air pollution and provisions authorizing the Secretary to establish classes of potential pollution sources for which any Federal department or agency having jurisdiction over any facility was required to obtain a permit, under the specified terms and conditions, for the discharge of any matter into the air of the United States. 1967-Pub. L. 90-148 reenacted section without change.

Effective Date of 1977 Amendment

Amendment by Pub. L. 95-95 effective Aug. 7, 1977, except as otherwise expressly provided, see section 406(d) of Pub. L. 95-95, set out as a note under section 7401 of this title.

Pending Actions and Proceedings

Suits, actions, and other proceedings lawfully commenced by or against the Administrator or any other officer or employee of the United States in his official capacity or in relation to the discharge of his official duties under act July 14, 1955, the Clean Air Act, as in effect immediately prior to

the enactment of Pub. L. 95-95 [Aug. 7, 1977], not to abate by reason of the taking effect of Pub. L. 95-95, see section 406(a) of Pub. L. 95-95, set out as an Effective Date of 1977 Amendment note under section 7401 of this title.

Modification or Rescission of Rules, Regulations, Orders, Determinations, Contracts, Certifications, Authorizations, Delegations, and Other Actions All rules, regulations, orders, determinations, contracts, certifications, authorizations, delegations, or other actions duly issued, made, or taken by or pursuant to act July 14, 1955, the Clean Air Act, as in effect immediately prior to the date of enactment of Pub. L. 95-95 [Aug. 7, 1977] to continue in full force and effect until modified or rescinded in accordance with act July 14, 1955, as amended by Pub. L. 95-95 [this chapter], see section 406(b) of Pub. L. 95-95, set out as an Effective Date of 1977 Amendment note under section 7401 of this title.

Executive Order No. 11282

Ex. Ord. No. 11282, May 26, 1966, 31 F.R. 7663, which provided for the prevention, control, and abatement of air pollution from Federal activities, was superseded by Ex. Ord. No. 11507, Feb. 4, 1970, 35 F.R. 2573.

Executive Order No. 11507

Ex. Ord. No. 11507, Feb. 4, 1970, 35 F.R. 2573, which provided for the prevention, control, and abatement of air pollution at Federal facilities, was superseded by Ex. Ord. No. 11752, Dec. 17, 1973, 38 F.R. 34793, formerly set out as a note under section 4331 of this title.

Section Referred to in Other Sections

This section is referred to in sections 7410, 7423, 7604, 7671q of this title.

PRIMARY NONFERROUS SMELTER ORDERS

42 USC 7419

(a) Issuance; hearing; enforcement orders; statement of grounds for application; findings (1) Upon application by the owner or operator of a primary nonferrous smelter, a primary nonferrous smelter order under subsection (b) of this section may be issued

(A) by the Administrator, after thirty days' notice to the State, or

(B) by the State in which such source is located, but no such order issued by the State shall take effect until the Administrator determines that such order has been issued in accordance with the requirements of this chapter.

Not later than ninety days after submission by the State to the Administrator of notice of the issuance of a primary nonferrous smelter order under this section, the Administrator shall determine whether or not such order has been issued by the State in accordance with the requirements of this chapter. If the Administrator determines that such order has not been issued in accordance with such requirements, he shall conduct a hearing respecting the reasonably available control technology for primary nonferrous smelters. (2) (A) An order issued under this section to a primary nonferrous smelter shall be referred to as a "primary nonferrous smelter order". No primary nonferrous smelter may receive both an enforcement order under section 7413(d)' of this title and a primary nonferrous smelter order under this section.

(B) Before any hearing conducted under this section, in the case of an application made by the owner or operator of a primary nonferrous smelter for a second order under this section, the applicant shall furnish the Administrator (or the State as the case may be) with a statement of the grounds on which such application is based (including all supporting documents and information). The statement of the grounds for the proposed order shall be provided by the Administrator or the State in any case in which such State or Administrator is acting on its own initiative. Such statement (including such documents and information) shall be made available to the public for a thirtyday period before such hearing and shall be considered as part of such hearing. No primary nonferrous smelter order may be granted unless the applicant establishes that he meets the conditions required for the issuance of such order (or the Adminis'See References in Text note below.

trator or State establishes the meeting of such conditions when acting on their own initiative).

(C) Any decision with respect to the issuance of a primary nonferrous smelter order shall be accompanied by a concise statement of the findings and of the basis of such findings.

(3) For the purposes of sections 7410, 7604, and 7607 of this title, any order issued by the State and in effect pursuant to this subsection shall become part of the applicable implementa tion plan.

(b) Prerequisites to issuance of orders

A primary nonferrous smelter order under this section may be issued to a primary nonferrous smelter if

(1) such smelter is in existence on August 7, 1977;

(2) the requirement of the applicable implementation plan with respect to which the order is issued is an emission limitation or standard for sulfur oxides which is necessary and intended to be itself sufficient to enable attainment and maintenance of national primary and secondary ambient air quality standards for sulfur oxides; and

(3) such smelter is unable to comply with such requirement by the applicable date for compliance because no means of emission limitation applicable to such smelter which will enable it to achieve compliance with such requirement has been adequately demonstrated to be reasonably available (as determined by the Administrator, taking into account the cost of compliance, non-air quality health and environmental impact, and energy consideration).

(c) Second orders

(1) A second order issued to a smelter under this section shall set forth compliance schedules containing increments of progress which require compliance with the requirement postponed as expeditiously as practicable. The increments of progress shall be limited to requiring compliance with subsection (d) of this section and, in the case of a second order, to procuring, installing, and operating the necessary means of emission limitation as expeditiously as practicable after the Administrator determines such means have been adequately demonstrated to be reasonably available within the meaning of subsection (b)(3) of this section.

(2) Not in excess of two primary nonferrous smelter orders may be issued under this section to any primary nonferrous smelter. The first such order issued to a smelter shall not result in the postponement of the requirement with respect to which such order is issued beyond January 1, 1983. The second such order shall not result in the postponement of such requirement beyond January 1, 1988.

(d) Interim measures; continuous emission reduction technology

(1) (A) Each primary nonferrous smelter to which an order is issued under this section shall be required to use such interim measures for the period during which such order is in effect as may be necessary in the judgment of the Administrator to assure attainment and maintenance of the national primary and secondary ambient air quality standards during such period, taking into account the aggregate effect on air quality of such order together with all variances, extensions, waivers, enforcement orders, delayed compliance orders and primary nonferrous smelter orders previously issued under this chapter.

(B) Such interim requirements shall include

(i) a requirement that the source to which the order applies comply with such reporting requirements and conduct such monitoring as the Administrator determines may be necessary, and

(ii) such measures as the Administrator determines are necessary to avoid an imminent and substantial endangerment to health of persons.

(C) Such interim measures shall also, except as provided in paragraph (2), include continuous emission reduction technology. The Administrator shall condition the use of any such interim measures upon the agreement of the owner or operator of the smelter(i) to comply with such conditions as the Administrator determines are necessary to maximize the reliability and enforceability of such interim measures, as applied to the smelter, in attaining and maintaining the national ambient air quality standards to which the order relates, and

(ii) to commit reasonable resources to research and development of appropriate emission control technology.

(2) The requirement of paragraph (1) for the use of continuous emission reduction technology may be waived with respect to a particular smelter by the State or the Administrator, after notice and a hearing on the record, and upon a showing by the owner or operator of the smelter that such requirement would be so costly as to necessitate permanent or prolonged temporary cessation of operations of the smelter. Upon application for such waiver, the Administrator shall be notified and shall, within ninety days, hold a hearing on the record in accordance with section 554 of title 5. At such hearing the Administrator shall require the smelter involved to present information relating to any alleged cessation of operations and the detailed reasons or justifications therefor. On the basis of such hearing the Administrator shall make findings of fact as to the effect of such requirement and on the alleged cessation of operations and shall make such recommendations as he deems appropriate. Such report, findings, and recommendations shall be available to the public, and shall be taken into account by the State or the Administrator in making the decision whether or not to grant such waiver.

(3) In order to obtain information for purposes of a waiver under paragraph (2), the Administrator may, on his own motion, conduct an investigation and use the authority of section 7621 of this title.

(4) In the case of any smelter which on August 7, 1977, uses continuous emission reduction technology and supplemental controls and which receives an initial primary nonferrous smelter order under this section, no additional continuous emission reduction technology shall be required as a condition of such order unless the Administrator determines, at any time, after notice and public hearing, that such additional continuous emission reduction technology is adequately demonstrated to be reasonably available for the primary nonferrous smelter industry.

(e) Termination of orders

At any time during which an order under this section applies, the Administrator may enter upon a public hearing respecting the availability of technology. Any order under this section shall be terminated if the Administrator determines on the record, after notice and public hearing, that the conditions upon which the order was based no longer exist. If the owner or operator of the smelter to which the order is issued demonstrates that prompt termination of such order would result in undue hardship, the termination shall become effective at the earliest practicable date on which such undue hardship would not result, but in no event later than the date required under subsection (c) of this section.

(f) Violation of requirements

If the Administrator determines that a smelter to which an order is issued under this section is in violation of any requirement of subsection (c) or (d) of this section, he shall—

(1) enforce such requirement under section 7413 of this title,

(2) (after notice and opportunity for public hearing) revoke such order and enforce compliance with the requirement with respect to which such order was granted,

(3) give notice of noncompliance and commence action under section 7420 of this title, or

(4) take any appropriate combination of such actions.

(July 14, 1955, ch. 360, title I, Sec. 119, as added Pub. L. 95-95, title I, Sec. 117(b), Aug. 7, 1977, 91 Stat. 712; amended Pub. L. 95-190, Sec. 14(a)(25)-(27), Nov. 16, 1977, 91 Stat. 1401.)

References in Text

Section 7413(d) of this title, referred to in subsec. (a)(2)(A), was amended generally by Pub. L. 101549, title VII, Sec. 701, Nov. 15, 1990, 104 Stat. 2672, and, as so amended, no longer relates to final compliance orders.

Prior Provisions

A prior section 119 of act July 14, 1955, ch. 360, title I, as added June 22, 1974, Pub. L. 93-319, Sec. 3, 88 Stat. 248, was classified to section 1857c-10 of this title and provided for the authority to deal with energy shortages, prior to repeal by Pub. L. 95-95, title I, Sec. 112(b)(1), Aug. 7, 1977, 91 Stat. 709, which provided that all references to such section 119 in any subsequent enactment which supersedes Pub. L. 93-319 shall be construed to refer to section 113(d) of the Clean Air Act and to paragraph (5) thereof in particular which is classified to section 7413(d)(5) of this title.

Amendments

1977-Subsec. (a)(3). Pub. L. 95-190, Sec. 14(a)(25), added par. (3).

Subsec. (d)(3). Pub. L. 95-190, Sec. 14(a)(26), substituted “7621” for “7619”.

Subsec. (e). Pub. L. 95-190, Sec. 14(a)(27), substituted “an order under this section” for “such order".

Effective Date

Section effective Aug. 7, 1977, except as otherwise expressly provided, see section 406(d) of Pub. L. 95-95, set out as an Effective Date of 1977 Amendment note under section 7401 of this title.

Modification or Rescission of Rules, Regulations, Orders, Determinations, Contracts, Certifications, Authorizations, Delegations, and Other Actions All rules, regulations, orders, determinations, contracts, certifications, authorizations, delegations, or other actions duly issued, made, or taken by or pursuant to act July 14, 1955, the Clean Air Act, as in effect immediately prior to the date of enactment of Pub. L. 95-95 [Aug. 7, 1977] to continue in full force and effect until modified or rescinded in accordance with act July 14, 1955, as amended by Pub. L. 95-95 [this chapter], see section 406(b) of Pub. L. 95-95, set out as an Effective Date of 1977 Amendment note under section 7401 of this title.

Section Referred to in Other Sections

This section is referred to in sections 7410, 7420, 7604, 7607, 7621 of this title; title 15 sections 793, 798.

NONCOMPLIANCE PENALTY

42 USC 7420

(a) Assessment and collection

(1) (A) Not later than 6 months after August 7, 1977, and after notice and opportunity for a public hearing, the Administrator shall promulgate regulations requiring the assessment and collection of a noncompliance penalty against persons referred to in paragraph (2)(A).

(B) (i) Each State may develop and submit to the Administrator a plan for carrying out this section in such State. If the Administrator finds that the State plan meets the requirements of this section, he may delegate to such State any authority he has to carry out this section.

(ii) Notwithstanding a delegation to a State under clause (i), the Administrator may carry out this section in such State under the circumstances described in subsection (b)(2)(B) of this section.

(2) (A) Except as provided in subparagraph (B) or (C) of this paragraph, the State or the Administrator shall assess and collect a noncompliance penalty against every person who owns or operates

(i) a major stationary source (other than a primary nonferrous smelter which has received a primary nonferrous smelter order under section 7419 of this title), which is not in compliance with any emission limitation, emission standard or compliance schedule under any applicable implementation plan (whether or not such source is subject to a Federal or State consent decree), or

(ii) a stationary source which is not in compliance with an emission limitation, emission standard, standard of performance, or other requirement established under section 7411, 7477, 7603, or 7412 of this title, or

(iii) a stationary source which is not in compliance with any requirement of subchapter IV-A, V, or VI of this chapter, or

(iv) any source referred to in clause (i), (ii), or (iii) (for which an extension, order, or suspension referred to in subparagraph (B), or Federal or State consent decree is in effect), or a primary nonferrous smelter which has received a primary nonferrous smelter order under section 7419 of this title which is not in compliance with any interim emission control requirement or schedule of compliance under such extension, order, suspension, or consent decree.

« PreviousContinue »